Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJCDC® C-550, Notice to Proceed. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />NOTICE TO PROCEED <br />Owner: Orange County Owner’s Project No.: <br />Engineer: Draper Aden Associates Engineer’s Project No.: R00592-226N <br />Contractor: Contractor’s Project No.: <br />Project: C&D Landfill Phase 2 Construction <br />Contract Name: <br />Effective Date of Contract: <br />Owner hereby notifies Contractor that the Contract Times under the above Contract will commence to <br />run on [date Contract Times are to start]. <br />On that date, Contractor shall start performing its obligations under the Contract Documents. No Work <br />will be done at the Site prior to such date. <br />In accordance with the Agreement: <br />The number of days to achieve Substantial Completion is 150 from the date stated above for the <br />commencement of the Contract Times, resulting in a date for Substantial Completion of [date, <br />calculated from commencement date above]; and the number of days to achieve readiness for final <br />payment is 180 from the commencement date of the Contract Times, resulting in a date for readiness <br />for final payment of [date, calculated from commencement date above]. <br />Before starting any Work at the Site, Contractor must comply with the following: <br />[Note any access limitations, security procedures, or other restrictions] <br />Owner: [Full formal name of Owner] <br />By (signature): <br />Name (printed): <br />Title: <br />Date Issued: <br />Copy: Engineer <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.