Orange County NC Website
EJCDC® C-615, Payment Bond. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 2 of 4 <br />1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, <br />administrators, successors, and assigns to the Owner to pay for labor, materials, and equipment <br />furnished for use in the performance of the Construction Contract, which is incorporated herein by <br />reference, subject to the following terms. <br />2. If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies, <br />and holds harmless the Owner from claims, demands, liens, or suits by any person or entity seeking <br />payment for labor, materials, or equipment furnished for use in the performance of the Construction <br />Contract, then the Surety and the Contractor shall have no obligation under this Bond. <br />3. If there is no Owner Default under the Construction Contract, the Surety’s obligation to the Owner <br />under this Bond will arise after the Owner has promptly notified the Contractor and the Surety (at the <br />address described in Paragraph 13) of claims, demands, liens, or suits against the Owner or the <br />Owner’s property by any person or entity seeking payment for labor, materials, or equipment <br />furnished for use in the performance of the Construction Contract, and tendered defense of such <br />claims, demands, liens, or suits to the Contractor and the Surety. <br />4. When the Owner has satisfied the conditions in Paragraph 3, the Surety shall promptly and at the <br />Surety’s expense defend, indemnify, and hold harmless the Owner against a duly tendered claim, <br />demand, lien, or suit. <br />5. The Surety’s obligations to a Claimant under this Bond will arise after the following: <br />5.1. Claimants who do not have a direct contract with the Contractor <br />5.1.1. have furnished a written notice of non-payment to the Contractor, stating with <br />substantial accuracy the amount claimed and the name of the party to whom the <br />materials were, or equipment was, furnished or supplied or for whom the labor was <br />done or performed, within ninety (90) days after having last performed labor or last <br />furnished materials or equipment included in the Claim; and <br />5.1.2. have sent a Claim to the Surety (at the address described in Paragraph 13). <br />5.2. Claimants who are employed by or have a direct contract with the Contractor have sent a Claim <br />to the Surety (at the address described in Paragraph 13). <br />6. If a notice of non-payment required by Paragraph 5.1.1 is given by the Owner to the Contractor, that <br />is sufficient to satisfy a Claimant’s obligation to furnish a written notice of non-payment under <br />Paragraph 5.1.1. <br />7. When a Claimant has satisfied the conditions of Paragraph 5.1 or 5.2, whichever is applicable, the <br />Surety shall promptly and at the Surety’s expense take the following actions: <br />7.1. Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt <br />of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts <br />that are disputed; and <br />7.2. Pay or arrange for payment of any undisputed amounts. <br />7.3. The Surety’s failure to discharge its obligations under Paragraph 7.1 or 7.2 will not be deemed <br />to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, <br />except as to undisputed amounts for which the Surety and Claimant have reached agreement. <br />If, however, the Surety fails to discharge its obligations under Paragraph 7.1 or 7.2, the Surety <br />shall indemnify the Claimant for the reasonable attorney’s fees the Claimant incurs thereafter <br />to recover any sums found to be due and owing to the Claimant. <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED