Browse
Search
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-367-Solid Waste-Shamrock Environmental Corporation-C&D Cell Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:28:23 AM
Creation date
7/21/2021 9:24:29 AM
Metadata
Fields
Template:
Contract
Date
6/25/2021
Contract Starting Date
6/25/2021
Contract Ending Date
6/30/2021
Contract Document Type
Agreement
Amount
$197,593.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />Revised 07/20 <br /> <br />2.7 For those materials specified without the use of brand names, the Contractor shall submit <br />within thirty (30) days after his receiving the Construction Contract for signatures, any product <br />that meets the express requirements of the Specifications. Such Submittal shall include <br />manufacturer's data, test reports, performance data and certifications, samples, erection details, <br />and other applicable information as required to permit determination by the Designer whether <br />such proposed products are suitable. The Designer shall be the sole judge as to the suitability of <br />any proposed product. The burden of proof of quality rests with the Contractor. <br /> <br />2.8 The Contractor is required to examine and read the complete set of Contract Documents for <br />information concerning the Work, because some of the Work for which the Contractor will be <br />responsible may be indicated on or in documentation applying primarily to the Work of one or <br />more other separate prime contractors. No allowance will be made for the Contractor’s failure to <br />become familiar with the complete set of project documents. <br /> <br />2.9 Contractor’s requests for clarification or information shall clearly define the cause(s) of <br />Contractor’s request and, as appropriate, shall include Contractor’s interpretation and <br />Contractor’s proposed solution. <br /> <br />ARTICLE 3. FAMILIARITY WITH WORK, CONDITIONS AND LAWS <br /> <br />3.1 The Contractor has investigated prior to bidding and is satisfied with all conditions affecting <br />the Work, including but not restricted to those bearing upon transportation, disposal, handling <br />and storage of materials, availability of labor, water, electrical power, roads and uncertainties of <br />weather, or similar physical conditions at the Project site, and the character of equipment and <br />facilities needed prior to and during prosecution of the Work. The Contractor is satisfied as to <br />the character, quality and quantity of surface and subsurface materials or obstacles to be <br />encountered insofar as this information is reasonably ascertainable from inspection of the <br />Project site, including all exploratory work done by the Owner, as well as from information <br />presented by the Contract Documents, or any other information made available to the <br />Contractor prior to receipt of bids. Any failure by the Contractor to become acquainted with the <br />available information shall not relieve the Contractor from the responsibility for estimating <br />properly the difficulty or cost of successfully performing the Work. <br /> <br />3.2 The Contractor shall be entitled to make all inferences from the Contract Documents that <br />would reasonably be made by a contractor having knowledge and experience with similar work; <br />however, the Contractor shall not be entitled to infer from the Contract Documents any fact or <br />condition which would not be inferred by a contractor having knowledge and experience with <br />similar work and the Contractor shall be required to obtain independently such other information <br />as a knowledgeable and experienced contractor would prudently obtain in order to evaluate any <br />such condition. <br /> <br />3.3 The Contractor specifically acknowledges familiarity with all Federal, State, and local laws, <br />ordinances, rules, and regulations which may in any manner affect those engaged or employed <br />in the Work, or the materials or equipment in or about the Work, or in any way affect the conduct <br />of the Work and agrees that the Contractor and the Contractor’s employees, subcontractors, <br />and suppliers will, at all times, comply with same. If the Contractor shall discover any provisions <br />in the Contract Documents which are contrary to or inconsistent with any such law, ordinance, <br />rule, or regulation, the Contractor shall immediately give notice thereof to the Designer and the <br />Owner in writing, identifying any items of Work affected, and the Contractor shall not proceed <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED
The URL can be used to link to this page
Your browser does not support the video tag.