Orange County NC Website
EJCDC® C-510, Notice of Award. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 1 of 1 <br />NOTICE OF AWARD <br />Date of Issuance: <br />Owner: Orange County Owner’s Project No.: <br />Engineer: Draper Aden Associates Engineer’s Project No.: R00592-226N <br />Project: C&D Landfill Phase 2 Construction <br />Contract Name: <br />Bidder: <br />Bidder’s Address: <br />You are notified that Owner has accepted your Bid dated [date] for the above Contract, and that you are the <br />Successful Bidder and are awarded a Contract for: <br />[Describe Work, alternates, or sections of Work awarded] <br />The Contract Price of the awarded Contract is $[Contract Price]. Contract Price is subject to adjustment based on <br />the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work <br />performed on a cost-plus-fee basis, as applicable. <br />[Number of copies sent] unexecuted counterparts of the Agreement accompany this Notice of Award, and one <br />copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to <br />Bidder electronically. <br />☐ Drawings will be delivered separately from the other Contract Documents. <br />You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of <br />Award: <br />1. Deliver to Owner [number of copies sent] counterparts of the Agreement, signed by Bidder (as <br />Contractor). <br />2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment <br />bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General <br />Conditions. <br />3. Other conditions precedent (if any): [Describe other conditions that require Successful Bidder’s <br />compliance] <br />Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, <br />annul this Notice of Award, and declare your Bid security forfeited. <br />Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart <br />of the Agreement, together with any additional copies of the Contract Documents as indicated. <br />Owner: [Full formal name of Owner] <br />By (signature): <br />Name (printed): <br />Title: <br />Copy: Engineer <br />DocuSign Envelope ID: 0844D1D6-E311-4FC5-8B5B-BB1E27A908ED