Orange County NC Website
<br />z <br />benefits and mitigation measures will be tletailetl in the Tler II environmental documentation <br />prOCe33. <br />Impacts of the SEHSR protect In Orange County cannot be fully determined until the RecoN of <br />Decision has been matle antl tlefails to be determined In the Tler II EIS have been worketl out. <br />The Tier II s[utly pracesa la scheduletl to begin in January 2003. <br />The altachetl information package from the public hearing heltl in Durham on September 18, 2001 <br />contains pertinent pages fromthe Executive Summary of the Tier I Drak EIS. (The In/ormepon <br />package sent under separate cover has been espied /mm the October 16, 2001 9000 agenda <br />materials. Please refer to the October 16 in/ortnatlon package for color pullouts o1 the ettemeflve <br />mules, which are provided in black antl while in the aftachetl in/armaGOn peckegeJ <br />FINANCIAL IMPACT: None at this time. <br />RECOMMENDATION: The Atlminlstretlon recommentls that the BOaM receive the mport end <br />address any comments [o stafr b be bnvartletl fc NCOOT Rail Division. <br />