Browse
Search
Agenda - 11-05-2003-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-05-2003
>
Agenda - 11-05-2003-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:14:31 AM
Creation date
8/29/2008 10:35:26 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20031105
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances (2)
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY PLANNING DEPARTMENT 12 <br />ATTACHMENZZ <br />306F REVERE ROAD October' ll, Z00:3 <br />HILLSBOROUGH, NORTH CAROLINA 27278 BOCC Mrenrvc <br />TABLE, GROWTH MANAGEMENT SYSTEM <br />URBAN DESIGNATION <br />WITHIN TRANSITION AREA OVERLAY AND WATER AND SEWER SERVICE AREAS 1 <br />PRIMARILY RURAL RESIDENTIAL R-1 AND OTHER ZONING DISTRICTS <br />TAN* <br /> MAIOR SUBDIVISIONS <br /> STANDARD <br />CLASS A SPECIAL USE PERMIT PLANNED <br /> MA]OR DEVELOPMENT <br />1, Nu ` <br />e~r of 6-20 21-40 41-79 80+ <br /> o <br /> Yes, Yes, Yes, Yes, <br /> Minimum Existing Standards in Section Standards in Section Standards in Section <br />2 Subdivision Upgraded IV of Subdivision Code IV of Subdivision IV of Subdivision <br /> Design Standards in Code Code <br /> Standards Section IV of <br /> Subdivision Code <br /> Yes, Yes, Yes, <br /> General General <br /> General Requirements Requirements in Requirements in <br /> in Article 8.1-8.7, 8.8 Article 8.1-8,7, 8,8 Article 8.1-8,7, 8.8 <br />4 Special Use NO a-d and a-d and a-d and <br /> Permit(QJ) <br /> Specific Requirements Specific Specific <br /> in 8.8.291A Requirements in Requirements in <br /> 8.8.29.1A and 8,8.29.1A and <br /> 8.8.29.iB 8.8.29.18 <br /> Planned Yes, <br /> Development <br />3. Zoning NO NO NO Requirements in <br /> Amendment Article 7 of Zoning <br /> (L) Code <br />Decision Processes: (L) -Legislative (QJ) -Quasi-Judicial <br />[1] Includes Adopted Comprehensive Plan 10 & 20-Year Transition Areas and EDD located in Water and Sewer Boundary <br />Agreement Service Areas <br />*See New Zoning District Map a/k/a Special Use Subdivision Growth Management System Map <br />Annotation Notes: (not to be part of Ordinance) <br />• All Subdivision proposals must also be in accordance with Land Use Density and Zoning Regulations, <br />• No change recommended for Minor Subdivisions or Major Subdivisions equal to or less than 20 lots <br />
The URL can be used to link to this page
Your browser does not support the video tag.