Browse
Search
Agenda - 11-05-2003-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-05-2003
>
Agenda - 11-05-2003-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:14:31 AM
Creation date
8/29/2008 10:35:26 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20031105
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-141 Growth Management System - Amendments to Zoning and Subdivision Ordinances (2)
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to <br />BOCC Rork Session <br />8/29lU2 <br />Growth Control Recommendations <br />I. Develop an outline for a special use permit (SUP) process for the subdivision of land <br />creating 20 or more lots to be presented at 9/17/2002 BOCC meeting <br />II. Notify every applicant for residential subdivision approval: <br />(1) whose application or proposed application is not also for a planned development <br />special use permit; or <br />(2) whose application or planned application involves the subdivision of land into <br />20 or more lots <br />that the Board of Commissioners will consider amending the Orange County Zoning <br />Ordinance, on or before December 2, 2002, to provide.that any subdivision of land <br />creating 20 or more lots is a special use requiring a special use pemtit. <br />• The amendments that will be considered may include other procedural and <br />substantive requirements, These requiremerts may include: <br />(a) greater detail, coverage and confirmation of the "yield plan" required in <br />the evaluation of whether the prof ect may be approved as a conventtonat plan or a <br />flexible plan; <br />(b) professionally prepazed groundwater analysis if the residential lots aze <br />proposed to be served by weAs; <br />(c) public water supply availability if the residential lots aze proposed to be <br />served by a public water system, <br />• The notification shall advise the applicant that the applicant will not be considered to <br />have acted in good faith if the applicant proceeds, after the notification, with an <br />application while the amendments are under consideration. <br />An application that has received special use permit approval, preliminary plan <br />approval or that has been scheduled for Boazd of Commissioner preliminary plan <br />actions, will not be so notified and may proceed according to its special use permit or <br />preliminary plan approval and'the Orange County Zoning Ordinance and Subdivision <br />Regulations in effect on the date of approval. <br />Begin the notification process as soon as possible. <br />s Only one residential subdivision that has not received either a special use peravt or preliminary <br />plan approval would likely qualify for consideration by the Board of Commissioners under the <br />zoning and subdivision rules in place now. That subdivision is Eno Ridge which is scheduled for <br />Board consideration on September 17, 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.