Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20052 / Orange County - Court Street <br />Annex <br />22 4000 - 3 PLUMBING FIXTURES <br />c. Comply with ICC A117.1. <br />5. Fasteners: Reusable, snap-locking fasteners with no sharp or abrasive external surfaces. <br />No cable ties allowed. <br />2.06 BI-LEVEL, ELECTRIC WATER COOLERS <br />A. Bi-level, Electric Water Cooler Manufacturers: <br />1. Elkay Manufacturing Company; ______: www.elkay.com/#sle. <br />2. Haws Corporation; ______: www.hawsco.com/#sle. <br />3. Murdock Manufacturing, Inc; ______: www.murdockmfg.com/#sle. <br />B. Water Cooler: Bi-level, electric, mechanically refrigerated; surface mounted, ADA compliant; <br />stainless steel top, vinyl on steel body, elevated anti-squirt bubbler with stream guard, automatic <br />stream regulator, push button, mounting bracket; integral air cooled condenser and stainless <br />steel grille. <br />1. Capacity: 8 gallons per hour (30.3 liters per hour) of 50 degrees F (10 degrees C) water <br />with inlet at 80 degrees F (27 degrees C) and room temperature of 90 degrees F (32 <br />degrees C), when tested in accordance with ASHRAE Std 18. <br />2. Electrical: 115 V, 60 Hertz compressor, 6 foot (2 m) cord and plug for connection to <br />electric wiring system including grounding connector. <br />C. Bottle Filler: Materials to match fountain. <br />PART 3 EXECUTION <br />3.01 INSTALLATION <br />A. Install each fixture with trap, easily removable for servicing and cleaning. <br />B. Install components level and plumb. <br />3.02 SCHEDULES <br />A. Fixture Heights: Install fixtures to heights above finished floor as indicated. <br />1. Water Closet: <br />a. Standard: 15 inches (380 mm) to top of bowl rim. <br />b. Accessible: 18 inches (455 mm) to top of seat. <br />2. Water Closet Flush Valves: <br />a. Standard: 11 inches (280 mm) min. above bowl rim. <br />b. Recessed: 10 inches (255 mm) min. above bowl rim. <br />3. Lavatory: <br />a. Standard: 31 inches (785 mm) to top of basin rim. <br />b. Accessible: 34 inches (865 mm) to top of basin rim. <br />END OF SECTION 22 4000 <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.