Orange County NC Website
3.04 CLOSEOUT <br />A. Closeout Demonstration: Demonstrate proper operation of all functions to Owner. <br />1. Be prepared to conduct any of the required tests. <br />2. Have at least one copy of operation and maintenance data, preliminary copy of project <br />record drawings, input/output matrix, and operator instruction chart(s) available during <br />demonstration. <br />3. Have authorized technical representative of control unit manufacturer present during <br />demonstration. <br />4. Demonstration may be combined with inspection and testing required by authority having <br />jurisdiction; notify authority having jurisdiction in time to schedule demonstration. <br />5. Repeat demonstration until successful. <br />B. Occupancy of the project will not occur prior to Project Acceptance. <br />C. Project Acceptance of the project cannot be achieved until inspection and testing is successful <br />and: <br />1. Approved operating and maintenance data has been delivered. <br />2. Spare parts, extra materials, and tools have been delivered. <br />3. All aspects of operation have been demonstrated to Owner. <br />4. Final acceptance of the fire alarm system has been given by authorities having jurisdiction. <br />5. Occupancy permit has been granted. <br />6. Specified pre-closeout instruction is complete. <br />END OF SECTION 28 4600 <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392