Orange County NC Website
Construction Documents <br />20052.02 / Orange County - Justice <br />Facility <br />26 5100 - 1 INTERIOR AND EXTERIOR <br />LIGHTING <br />SECTION 26 5100 <br />INTERIOR AND EXTERIOR LIGHTING <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Interior luminaires. <br />B.Emergency lighting units. <br />C.Exit signs. <br />D.Ballasts and drivers. <br />E.Fluorescent emergency power supply units. <br />F.Lamps. <br />G.Luminaire accessories. <br />1.02 RELATED REQUIREMENTS <br />A.Section 26 0533.16 - Boxes and Cabinets. <br />B.Section 26 0553 - Identification for Electrical Systems: Identification products and <br />requirements. <br />C.Section 26 0923 - Lighting Control Devices: Automatic controls for lighting including occupancy <br />sensors. <br />1.03 REFERENCE STANDARDS <br />A.IES LM-79 - Approved Method: Electrical and Photometric Measurements of Solid-State <br />Lighting Products; 2008. <br />B.NFPA 70 - National Electrical Code; National Fire Protection Association, Including All <br />Applicable Amendments and Supplements; 2017. <br />C.NFPA 101 - Life Safety Code; Most Recent Edition Adopted by Authority Having Jurisdiction, <br />Including All Applicable Amendments and Supplements. <br />D.UL 924 - Emergency Lighting and Power Equipment; Current Edition, Including All Revisions. <br />E.UL 935 - Fluorescent-Lamp Ballasts; Current Edition, Including All Revisions. <br />F.UL 1598 - Luminaires; Current Edition, Including All Revisions. <br />1.04 ADMINISTRATIVE REQUIREMENTS <br />A.Coordination: <br />1.Coordinate the installation of luminaires with mounting surfaces installed under other <br />sections or by others. Coordinate the work with placement of supports, anchors, etc. <br />required for mounting. Coordinate compatibility of luminaires and associated trims with <br />mounting surfaces at installed locations. <br />2.Coordinate the placement of luminaires with structural members, ductwork, piping, <br />equipment, diffusers, fire suppression system components, and other potential conflicts <br />installed under other sections or by others. <br />3.Coordinate the placement of exit signs with furniture, equipment, signage or other potential <br />obstructions to visibility installed under other sections or by others. <br />4.Notify Architect of any conflicts or deviations from the contract documents to obtain <br />direction prior to proceeding with work. <br />1.05 SUBMITTALS <br />A.Shop Drawings: <br />1.Indicate dimensions and components for each luminaire that is not a standard product of <br />the manufacturer. <br />B.Product Data: Provide manufacturer's standard catalog pages and data sheets including <br />detailed information on luminaire construction, dimensions, ratings, finishes, mounting <br />requirements, listings, service conditions, photometric performance, installed accessories, and <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392