Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Documents <br />20052.02 / Orange County - Justice <br />Facility <br />26 2726 - 5 WIRING DEVICES <br />b. Configuration: <br />1) Power: Two standard convenience duplex receptacles. <br />2) Communications: As indicated on drawings. <br />3) Voice and Data Jacks: As indicated on the drawings. <br />2. Accessories: <br />a. Closure Plugs: Size and fire rating as required to seal unused core hole and maintain <br />fire rating of floor. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A. Verify that field measurements are as indicated. <br />B. Verify that outlet boxes are installed in proper locations and at proper mounting heights and are <br />properly sized to accommodate devices and conductors in accordance with NFPA 70. <br />C. Verify that wall openings are neatly cut and will be completely covered by wall plates. <br />D. Verify that final surface finishes are complete, including painting. <br />E. Verify that floor boxes are adjusted properly. <br />F. Verify that branch circuit wiring installation is completed, tested, and ready for connection to <br />wiring devices. <br />G. Verify that core drilled holes for poke-through assemblies are in proper locations. <br />H. Verify that conditions are satisfactory for installation prior to starting work. <br />3.02 PREPARATION <br />A. Provide extension rings to bring outlet boxes flush with finished surface. <br />B. Clean dirt, debris, plaster, and other foreign materials from outlet boxes. <br />3.03 INSTALLATION <br />A. Perform work in a neat and workmanlike manner. <br />B. Coordinate locations of outlet boxes provided under Section 26 0533.16 as required for <br />installation of wiring devices provided under this section. <br />1. Orient outlet boxes for vertical installation of wiring devices unless otherwise indicated. <br />2. Where multiple receptacles, wall switches, or wall dimmers are installed at the same <br />location and at the same mounting height, gang devices together under a common wall <br />plate. <br />3. Locate receptacles for electric drinking fountains concealed behind drinking fountain <br />according to manufacturer's instructions. <br />C. Install wiring devices in accordance with manufacturer's instructions. <br />D. Install permanent barrier between ganged wiring devices when voltage between adjacent <br />devices exceeds 300 V. <br />E. Where required, connect wiring devices using pigtails not less than 6 inches (150 mm) long. Do <br />not connect more than one conductor to wiring device terminals. <br />F. Connect wiring devices by wrapping conductor clockwise 3/4 turn around screw terminal and <br />tightening to proper torque specified by the manufacturer. Where present, do not use push-in <br />pressure terminals that do not rely on screw-actuated binding. <br />G. Unless otherwise indicated, connect wiring device grounding terminal to branch circuit <br />equipment grounding conductor and to outlet box with bonding jumper. <br />H. Provide GFCI receptacles with integral GFCI protection at each location indicated. Do not use <br />feed-through wiring to protect downstream devices. <br />I. Install wiring devices plumb and level with mounting yoke held rigidly in place. <br />J. Install wall switches with OFF position down. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.