Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Asbestos Abatement Guidelines and Policies <br />Page 01560-2 <br />F. Contractor shall install a negative pressure system as outlined by section 01513. <br /> <br />G. No water or ACBM may be left standing on the floor at the end of the workday. <br /> <br />H. The contractor shall establish and mark emergency and fire exit from the work area. <br />Emergency procedures shall have priority over established decontamination entry and <br />exit procedures. Audible and visible fire and emergency evacuation alarms shall be <br />installed to be heard and seen throughout the entire work area. <br /> <br />I. Integrity of these seals shall be regularly checked and maintained by the contractor. <br /> <br />J. After work area preparation, the contractor shall notify the air monitor verbally with <br />written follow-up that he is ready for a pre-work inspection. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.