Construction Documents <br />20052.02 / Orange County - Justice <br />Facility <br />26 0100 - 2 ELECTRICAL GENERAL <br />PROVISIONS <br />1.04 PRODUCT DELIVERY, STORAGE AND HANDLING <br />A.All material and equipment shall be delivered and unloaded by the Contractor within the project <br />site as noted herein or as directed by the Owner. <br />B.The Contractor shall protect all material and equipment from breakage, theft or weather <br />damage. No material or equipment shall be stored on the ground. <br />C.The material and equipment shall remain the property of the Contractor until the project has <br />been completed and turned over to the Owner. <br />D.Where equipment cannot be stored at the site due to exposure to the elements or lack of <br />storage space , the contractor shall store all equipment in a bonded warehouse until the time of <br />installation. <br />1.05 WORK CONDITIONS AND COORDINATION <br />A.The Contractor shall review the entire set of plans to establish points of connection and the <br />extent of electrical work to be provided in his Contract. <br />B.The contractor is responsible for reviewing the complete set of contract documents. Coordinate <br />all phasing requirements with architectural drawings. Coordinate equipment locations and utility <br />routing with all trades to ensure code compliance and constructibility. <br />C.This Contractor shall be responsible for all electrical work and make final connections to <br />equipment installed in his Contract. <br />D.Pipe, conduit and duct chases required for installation of work shall be provided by the General <br />Contractor unless otherwise noted. This Contractor shall be responsible for coordinating the <br />location of all required chases. <br />E.All work shall be coordinated with other trades. Cutting of new work and subsequent patching <br />shall be approved by Architect/ Engineer and shall be at the Contractor's expense with no extra <br />cost to the Owner. <br />1.06 GUARANTEE <br />A.See the General and Supplementary General Conditions. <br />B.Where extended warranties or guarantees are available from the manufacturer, the Contractor <br />shall prepare the necessary Contract Documents to validate these warranties as required by the <br />manufacturer and present them to the Architect/Engineer. <br />PART 2 PRODUCTS <br />2.01 MATERIAL QUALITY <br />A.Material and equipment shall be new, unless noted otherwise, of the highest grade and quality <br />and free from defects or other imperfections. Material and equipment found defective shall be <br />removed and replaced at the Contractor's expense. <br />2.02 EQUIPMENT LISTINGS <br />A.All materials and equipment shall be third party listed by an agency accredited by the NCBCC <br />and NC Department of Insurance (NC DOI). The list of accredited agencies may be obtained on <br />NCDOI's web site. <br />PART 3 EXECUTION <br />3.01 INSPECTION <br />A.If any part of this Contractor's work is dependent for its proper execution or for its subsequent <br />efficiency or appearance on the character or conditions of contiguous work not executed by him, <br />the Contractor shall examine and measure such contiguous work and report to the Architect or <br />Engineer in writing any imperfection therein, or conditions that render it unsuitable for the <br />reception of this work. Should the Contractor proceed without making such written report, he <br />shall be held to have accepted such work and the existing conditions and he shall be <br />responsible for any defects in this work consequent hereon and will not be relieved of the <br />obligation of any guarantee because of any such imperfection or condition. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392