Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett WHEELCHAIR LIFTS <br />2020046/2020047/2020048/2020049/2020055 14 42 00 - 4 <br />F. Lubricate operating parts of lift, including drive mechanism, guide rails, hinges, safety devices, and <br />hardware. <br />3.3 FIELD QUALITY CONTROL <br />A. Acceptance Testing: On completion of lift installation and before permitting use of lifts, perform <br />acceptance tests as required and recommended by ASME A18.1 and authorities having jurisdiction. <br />B. Operating Test: In addition to acceptance testing, load lifts to rated capacity and operate continuously for <br />30 minutes between lowest and highest landings served. Readjust stops, signal equipment, and other <br />devices for accurate stopping and operation of system. <br />3.4 DEMONSTRATION <br />A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, <br />operate, and maintain lifts. Include a review of emergency systems and emergency procedures to be <br />followed at time of operational failure and other building emergencies. <br />B. Check operation of lifts with Owner's personnel present and before date of Substantial Completion. <br />Determine that operating systems and devices are functioning properly. <br />C. Check operation of lifts with Owner's personnel present not more than one month before end of warranty <br />period. Determine that operating systems and devices are functioning properly. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392