Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett WHEELCHAIR LIFTS <br />2020046/2020047/2020048/2020049/2020055 14 42 00 - 4 <br />F. Lubricate operating parts of lift, including drive mechanism, guide rails, hinges, safety devices, and <br />hardware. <br />3.3 FIELD QUALITY CONTROL <br />A. Acceptance Testing: On completion of lift installation and before permitting use of lifts, perform <br />acceptance tests as required and recommended by ASME A18.1 and authorities having jurisdiction. <br />B. Operating Test: In addition to acceptance testing, load lifts to rated capacity and operate continuously for <br />30 minutes between lowest and highest landings served. Readjust stops, signal equipment, and other <br />devices for accurate stopping and operation of system. <br />3.4 DEMONSTRATION <br />A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, <br />operate, and maintain lifts. Include a review of emergency systems and emergency procedures to be <br />followed at time of operational failure and other building emergencies. <br />B. Check operation of lifts with Owner's personnel present and before date of Substantial Completion. <br />Determine that operating systems and devices are functioning properly. <br />C. Check operation of lifts with Owner's personnel present not more than one month before end of warranty <br />period. Determine that operating systems and devices are functioning properly. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.