Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett SYSTEMS FURNITURE <br />2020046/2020047/2020048/2020049/2020055 12 59 00 - 2 <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A. Source Limitations: Obtain system furniture and accessories from single source from single manufacturer. <br />1. To the greatest extent possible coordinate with existing systems furniture <br />B. Manufacturers include: <br />1. Herman Miller <br />2. Steel Case <br />3. Open Plan Systems <br />4. Knoll <br />5. Approved Substitution. <br />2.2 MATERIALS <br />A. Systems Furniture: Components as indicated on Drawings including <br />1. Desks <br />2. Tables <br />3. Privacy Screen (door) <br />4. Shelving <br />5. Storage <br />6. Low Partition Walls <br />7. Raceways <br />8. Power and Data Outlets <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />1. Do not begin installation until substrates have been properly prepared. <br />2. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory <br />preparation before proceeding. <br />3.2 PREPARATION <br />A. Clean surfaces thoroughly prior to installation. <br />B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the <br />substrate under the project conditions. <br />3.3 INSTALLATION <br />A. Install in accordance with manufacturer's instructions and in proper relationship with adjacent construction. <br />Test for proper operation and adjust until satisfactory results are obtained. <br />3.4 PROTECTION <br />A. Protect installed products until completion of project. <br />B. Touch-up, repair or replace damaged products before Substantial Completion. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.