Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett SYSTEMS FURNITURE <br />2020046/2020047/2020048/2020049/2020055 12 59 00 - 1 <br />SECTION 12 59 00 – SYSTEMS FURNITURE <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Systems Furniture <br />1.2 PRE-INSTALLATION MEETING <br />A. Hold a pre-installation meeting at the project site with installer and related sub-contractors in attendance. <br />1.3 SUBMITTALS <br />A. Product Data: Manufacturer's data sheets on each product to be used, including: <br />1. Preparation instructions and recommendations. <br />2. Storage and handling requirements and recommendations. <br />3. Installation methods. <br />B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, <br />connections, and relationship with adjacent construction. <br />C. Verification Samples: For each finish product specified, two samples, representing actual product and <br />finish. <br />1.4 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Minimum 5 year experience manufacturing similar products. <br />B. Installer Qualifications: Minimum 2 year experience installing similar products. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and <br />manufacturer's identification until ready for installation. <br />B. Handling: Handle materials to avoid damage. <br />1.6 PROJECT CONDITIONS <br />A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by <br />manufacturer for optimum results. Do not install products under environmental conditions outside <br />manufacturer's recommended limits. <br />1.7 SEQUENCING <br />A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of <br />construction progress. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.