Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br /> <br />Smith Sinnett GYPSUM BOARD <br />2020046/2020047/2020048/2020049/2020055 09 29 00- 3 <br />PART 3 - EXECUTION <br />3.1 INSTALLATION AND FINISHING OF PANELS <br />A. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged. <br />B. Comply with ASTM C840. <br />C. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments. Provide <br />1/4- to 1/2-inch-wide spaces at these locations and trim edges with edge trim where edges of panels are <br />exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant. <br />D. For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. <br />Otherwise, attach trim according to manufacturer's written instructions. <br />E. Prefill open joints, rounded or beveled edges, and damaged surface areas. <br />F. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended <br />to receive tape. <br />G. Gypsum Board Finish Levels: Finish panels to levels indicated below and according to ASTM C840: <br />1. Level 4: At panel surfaces that will be exposed to view unless otherwise indicated. <br />3.2 PROTECTION <br />A. Protect installed products from damage from weather, condensation, direct sunlight, construction, and <br />other causes during remainder of the construction period. <br />B. Remove and replace panels that are wet, moisture damaged, and mold damaged. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.