Orange County NC Website
ORANGE COUNTY FACILITY RENOVATIONS <br /> <br /> <br />DOOR HARDWARE 087100-5 <br /> 12/21/2020 <br /> <br />C. Single Source Responsibility: Obtain each type of door hardware from single manufacturer. <br />D. Electrified Door Hardware: Listed and labeled as defined in NFPA 70, Article 100, by testing <br />agency acceptable to authorities having jurisdiction. <br />E. Accessibility Requirements: For door hardware on doors in an accessible route, comply with <br />governing accessibility regulations cited in “REFERENCES” article, herein. <br />F. Keying Conference <br />1. Incorporate keying conference decisions into final keying schedule after reviewing door <br />hardware keying system including: <br />a. Function of building, flow of traffic, purpose of each area, degree of security required, <br />and plans for future expansion. <br />b. Preliminary key system schematic diagram. <br />c. Requirements for access control. <br />d. Address for delivery of keys. <br />G. Pre-installation Conference <br />1. Review and finalize construction schedule and verify availability of materials, Installer's <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />2. Inspect and discuss preparatory work performed by other trades. <br />3. Inspect and discuss electrical roughing-in for electrified door hardware. <br />4. Review sequence of operation for each type of electrified door hardware. <br />5. Review required testing, inspecting, and certifying procedures. <br />H. Coordination Conferences: <br />1. Installation Coordination Conference: Prior to hardware installation, schedule and hold <br />meeting to review questions or concerns related to proper installation and adjustment of <br />door hardware. <br />2. Electrified Hardware Coordination Conference: Prior to ordering electrified hardware, <br />schedule and hold meeting to coordinate door hardware with security, electrical, doors <br />and frames, and other related suppliers. <br />1.06 DELIVERY, STORAGE, AND HANDLING <br />A. Inventory door hardware on receipt and provide secure lock-up for hardware delivered to <br />Project site. <br />B. Tag each item or package separately with identification coordinated with final door hardware <br />schedule, and include installation instructions, templates, and necessary fasteners with each <br />item or package. <br />1. Deliver each article of hardware in manufacturer’s original packaging. <br />C. Project Conditions: <br />1. Maintain manufacturer-recommended environmental conditions throughout storage and <br />installation periods. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392