Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY FACILITY RENOVATIONS <br /> <br /> <br />DOOR HARDWARE 087100-3 <br /> 12/21/2020 <br /> <br />4. Door Hardware Schedule: Submit schedule with hardware sets in vertical format as <br />illustrated by Sequence of Format for the Hardware Schedule as published by the Door <br />and Hardware Institute. Indicate complete designations of each item required for each <br />door or opening, include: <br />a. Door Index; include door number, heading number, and Architects hardware set <br />number. <br />b. Opening Lock Function Spreadsheet: List locking device and function for each <br />opening. <br />c. Quantity, type, style, function, size, and finish of each hardware item. <br />d. Name and manufacturer of each item. <br />e. Fastenings and other pertinent information. <br />f. Location of each hardware set cross-referenced to indications on Drawings. <br />g. Explanation of all abbreviations, symbols, and codes contained in schedule. <br />h. Mounting locations for hardware. <br />i. Door and frame sizes and materials. <br />j. Name and phone number for local manufacturer's representative for each product. <br />k. Operational Description of openings with any electrified hardware (locks, exits, <br />electromagnetic locks, electric strikes, automatic operators, door position switches, <br />magnetic holders or closer/holder units, and access control components). <br />Operational description should include operational descriptions for: egress, ingress <br />(access), and fire/smoke alarm connections. <br />1) Submittal Sequence: Submit door hardware schedule concurrent with <br />submissions of Product Data, Samples, and Shop Drawings. Coordinate <br />submission of door hardware schedule with scheduling requirements of other <br />work to facilitate fabrication of other work that is critical in Project construction <br />schedule. <br />5. Key Schedule: <br />a. After Keying Conference, provide keying schedule listing levels of keying as well as <br />explanation of key system's function, key symbols used and door numbers controlled. <br />b. Use ANSI/BHMA A156.28 “Recommended Practices for Keying Systems” as <br />guideline for nomenclature, definitions, and approach for selecting optimal keying <br />system. <br />c. Provide 3 copies of keying schedule for review prepared and detailed in accordance <br />with referenced DHI publication. Include schematic keying diagram and index each <br />key to unique door designations. <br />d. Index keying schedule by door number, keyset, hardware heading number, cross <br />keying instructions, and special key stamping instructions. <br />e. Provide one complete bitting list of key cuts and one key system schematic <br />illustrating system usage and expansion. <br />1) Forward bitting list, key cuts and key system schematic directly to Owner, by <br />means as directed by Owner. <br />f. Prepare key schedule by or under supervision of supplier, detailing Owner’s final <br />keying instructions for locks. <br />6. Templates: After final approval of hardware schedule, provide templates for doors, <br />frames and other work specified to be factory or shop prepared for door hardware <br />installation. <br />C. Informational Submittals: <br />1. Qualification Data: For Supplier, Installer and Architectural Hardware Consultant. <br />2. Product data for electrified door hardware: <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.