Orange County NC Website
ORANGE COUNTY FACILITY RENOVATIONS <br /> <br /> <br />DOOR HARDWARE 087100-2 <br /> 12/21/2020 <br /> <br />1.03 REFERENCES <br />A. UL - Underwriters Laboratories <br />1. UL 10B - Fire Test of Door Assemblies <br />2. UL 10C - Positive Pressure Test of Fire Door Assemblies <br />3. UL 1784 - Air Leakage Tests of Door Assemblies <br />B. DHI - Door and Hardware Institute <br />1. Sequence and Format for the Hardware Schedule <br />2. Recommended Locations for Builders Hardware <br />3. Key Systems and Nomenclature <br />C. ANSI - American National Standards Institute <br />1. ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware and <br />Specialties <br />1.04 SUBMITTALS <br />A. General: <br />1. Submit in accordance with Conditions of Contract and Division 01 requirements. <br />2. Highlight, encircle, or otherwise specifically identify on submittals deviations from <br />Contract Documents, issues of incompatibility or other issues which may detrimentally <br />affect the Work. <br />3. Prior to forwarding submittal, comply with procedures for verifying existing door and <br />frame compatibility for new hardware, as specified in PART 3, “EXAMINATION” article, <br />herein. <br />B. Action Submittals: <br />1. Product Data: Technical product data for each item of door hardware, installation <br />instructions, maintenance of operating parts and finish, and other information necessary <br />to show compliance with requirements. <br />2. Riser and Wiring Diagrams: After final approval of hardware schedule, submit details of <br />electrified door hardware, indicating: <br />a. Wiring Diagrams: For power, signal, and control wiring and including: <br />1) Details of interface of electrified door hardware and building safety and security <br />systems. <br />2) Schematic diagram of systems that interface with electrified door hardware. <br />3) Point-to-point wiring. <br />4) Risers. <br />3. Samples for Verification: If requested by Architect, submit production sample of <br />requested door hardware unit in finish indicated, and tagged with full description for <br />coordination with schedule. <br />a. Samples will be returned to supplier. Units that are acceptable to Architect may, after <br />final check of operations, be incorporated into Work, within limitations of key <br />coordination requirements. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392