Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br /> <br />Smith Sinnett ALUMINUM WINDOWS <br />2020046/2020047/2020048/2020049/2020055 08 51 13- 3 <br />2.5 ALUMINUM FINISHES <br />A. Finish designations prefixed by AA comply with the system established by the Aluminum Association for <br />designating aluminum finishes. <br />B. High-Performance Organic Finish (Two-Coat Fluoropolymer): AA-C12C40R1x (Chemical Finish: cleaned <br />with inhibited chemicals; Chemical Finish: conversion coating; Organic Coating: manufacturer's standard <br />two-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color <br />topcoat containing not less than 70percent polyvinylidene fluoride resin by weight). Prepare, pretreat, and <br />apply coating to exposed metal surfaces to comply with AAMA 2605 and with coating and resin <br />manufacturers' written instructions. <br />1. Color and Gloss: As selected by Architect. <br />EXECUTION <br />3.1 INSTALLATION <br />A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other <br />components. For installation procedures and requirements not addressed in manufacturer's written <br />instructions, comply with installation requirements in ASTM E2112. <br />B. Install windows level, plumb, square, true to line, without distortion or impeding thermal movement, <br />anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent <br />construction to produce weathertight construction. <br />C. Install windows and components to drain condensation, water penetrating joints, and moisture migrating <br />within windows to the exterior. <br />D. Separate aluminum and other corrodible surfaces from sources of corrosion or electrolytic action at points <br />of contact with other materials. <br />E. Clean exposed surfaces immediately after installing windows. Avoid damaging protective coatings and <br />finishes. Remove excess sealants, glazing materials, dirt, and other substances. <br />F. Remove and replace glass that has been broken, chipped, cracked, abraded, or damaged during construction <br />period. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.