Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS <br />2020046/2020047/2020048/2020049/2020055 08 41 13 - 1 <br />SECTION 08 41 13 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Interior Aluminum-framed storefront systems. <br />2. Aluminum-framed entrance door systems. <br />1.2 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />B. Shop Drawings: For aluminum-framed entrances and storefronts. Include plans, elevations, sections, full- <br />size details, and attachments to other work. <br />1. Show connection to and continuity with adjacent thermal, weather, air, and vapor barriers. <br />2. Include point-to-point wiring diagrams. <br />C. Samples: For each type of exposed finish required. <br />D. Entrance Door Hardware Schedule: Prepared by or under supervision of supplier, detailing fabrication <br />and assembly of entrance door hardware, as well as procedures and diagrams. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Energy Performance Certificates: NFRC-certified energy performance values from manufacturer. <br />B. Product test reports. <br />C. Source quality-control reports. <br />D. Field quality-control reports. <br />E. Sample warranties. <br />1.5 CLOSEOUT SUBMITTALS <br />A. Maintenance data. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392