Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett DEMONSTRATION AND TRAINING <br />2020046/2020047/2020048/2020049/2020055 01 79 00 - 2 <br />a. System, subsystem, and equipment descriptions. <br />b. Performance and design criteria if Contractor is delegated design responsibility. <br />c. Operating standards. <br />d. Regulatory requirements. <br />e. Equipment function. <br />f. Operating characteristics. <br />g. Limiting conditions. <br />h. Performance curves. <br />2. Documentation: Review the following items in detail: <br />a. Emergency manuals. <br />b. Systems and equipment operation manuals. <br />c. Systems and equipment maintenance manuals. <br />d. Product maintenance manuals. <br />e. Project Record Documents. <br />f. Identification systems. <br />g. Warranties and bonds. <br />h. Maintenance service agreements and similar continuing commitments. <br />3. Emergencies: Include the following, as applicable: <br />a. Instructions on meaning of warnings, trouble indications, and error messages. <br />b. Instructions on stopping. <br />c. Shutdown instructions for each type of emergency. <br />d. Operating instructions for conditions outside of normal operating limits. <br />e. Sequences for electric or electronic systems. <br />f. Special operating instructions and procedures. <br />4. Operations: Include the following, as applicable: <br />a. Startup procedures. <br />b. Equipment or system break-in procedures. <br />c. Routine and normal operating instructions. <br />d. Regulation and control procedures. <br />e. Control sequences. <br />f. Safety procedures. <br />g. Instructions on stopping. <br />h. Normal shutdown instructions. <br />i. Operating procedures for emergencies. <br />j. Operating procedures for system, subsystem, or equipment failure. <br />k. Seasonal and weekend operating instructions. <br />l. Required sequences for electric or electronic systems. <br />m. Special operating instructions and procedures. <br />5. Adjustments: Include the following: <br />a. Alignments. <br />b. Checking adjustments. <br />c. Noise and vibration adjustments. <br />d. Economy and efficiency adjustments. <br />6. Troubleshooting: Include the following: <br />a. Diagnostic instructions. <br />b. Test and inspection procedures. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.