Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett OPERATION AND MAINTENANCE DATA <br />2020046/2020047/2020048/2020049/2020055 01 78 23 - 3 <br />4.Water leak. <br />5.Power failure. <br />6.Water outage. <br />7.System, subsystem, or equipment failure. <br />8.Chemical release or spill. <br />D.Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar <br />codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, <br />supplier, and manufacturer to maintain warranties. <br />E.Emergency Procedures: Include the following, as applicable: <br />1.Instructions on stopping. <br />2.Shutdown instructions for each type of emergency. <br />3.Operating instructions for conditions outside normal operating limits. <br />4.Required sequences for electric or electronic systems. <br />5.Special operating instructions and procedures. <br />1.6 SYSTEMS AND EQUIPMENT OPERATION MANUALS <br />A.Systems and Equipment Operation Manual: Assemble a complete set of data indicating operation of each <br />system, subsystem, and piece of equipment not part of a system. Include information required for daily <br />operation and management, operating standards, and routine and special operating procedures. <br />B.Content: In addition to requirements in this Section, include operation data required in individual <br />Specification Sections and the following information: <br />1.System, subsystem, and equipment descriptions. Use designations for systems and equipment <br />indicated on Contract Documents. <br />2.Performance and design criteria if Contractor has delegated design responsibility. <br />3.Operating standards. <br />4.Operating procedures. <br />5.Operating logs. <br />6.Wiring diagrams. <br />7.Control diagrams. <br />8.Piped system diagrams. <br />9.Precautions against improper use. <br />10.License requirements including inspection and renewal dates. <br />C.Descriptions: Include the following: <br />1.Product name and model number. Use designations for products indicated on Contract <br />Documents. <br />2.Manufacturer's name. <br />3.Equipment identification with serial number of each component. <br />4.Equipment function. <br />5.Operating characteristics. <br />6.Limiting conditions. <br />7.Performance curves. <br />8.Engineering data and tests. <br />9.Complete nomenclature and number of replacement parts. <br />D.Operating Procedures: Include the following, as applicable: <br />1.Startup procedures. <br />2.Equipment or system break-in procedures. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.