Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett CLOSEOUT PROCEDURES <br />2020046/2020047/2020048/2020049/2020055 01 77 00 - 5 <br />k. Remove labels that are not permanent. <br />l. Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove <br />excess lubrication, paint and mortar droppings, and other foreign substances. <br />m. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting <br />from water exposure. <br />n. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of <br />diffusers, registers, and grills. <br />o. Clean ducts, blowers, and coils if units were operated without filters during construction or <br />that display contamination with particulate matter on inspection. <br />1) Clean HVAC system in compliance with NADCA ACR. Provide written report on <br />completion of cleaning. <br />p. Clean luminaires, lamps, globes, and reflectors to function with full efficiency. <br />q. Leave Project clean and ready for occupancy. <br />C. Pest Control: Comply with pest control requirements in Section 015000 "Temporary Facilities and <br />Controls." Prepare written report. <br />D. Construction Waste Disposal: Comply with waste disposal requirements in Section 017419 "Construction <br />Waste Management and Disposal." <br />3.2 REPAIR OF THE WORK <br />A. Complete repair and restoration operations before requesting inspection for determination of Substantial <br />Completion. <br />B. Repair, or remove and replace, defective construction. Repairing includes replacing defective parts, <br />refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating <br />equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove <br />and replace operating components that cannot be repaired. Restore damaged construction and permanent <br />facilities used during construction to specified condition. <br />1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other damaged <br />transparent materials. <br />2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces. Replace <br />finishes and surfaces that that already show evidence of repair or restoration. <br />a. Do not paint over "UL" and other required labels and identification, including mechanical <br />and electrical nameplates. Remove paint applied to required labels and identification. <br />3. Replace parts subject to operating conditions during construction that may impede operation or <br />reduce longevity. <br />4. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy <br />starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures. <br />END OF SECTION <br /> <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.