Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett EXECUTION <br />2020046/2020047/2020048/2020049/2020055 01 73 00 - 8 <br />3.8 STARTING AND ADJUSTING <br />A.Start equipment and operating components to confirm proper operation. Remove malfunctioning units, <br />replace with new units, and retest. <br />B.Adjust equipment for proper operation. Adjust operating components for proper operation without <br />binding. <br />C.Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace <br />damaged and malfunctioning controls and equipment. <br />D.Manufacturer's Field Service: Comply with qualification requirements in Section 01 40 00 "Quality <br />Requirements." <br />3.9 PROTECTION AND REPAIR OF INSTALLED CONSTRUCTION <br />A.Provide final protection and maintain conditions that ensure installed Work is without damage or <br />deterioration at time of Substantial Completion. <br />B.Repair Work previously completed and subsequently damaged during construction period. Repair to like- <br />new condition. <br />C.Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by <br />construction are maintained in condition that existed at commencement of the Work. <br />D.Comply with manufacturer's written instructions for temperature and relative humidity. <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.