Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett EXECUTION <br />2020046/2020047/2020048/2020049/2020055 01 73 00 - 2 <br />B.Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written <br />recommendations and instructions for installation of specified products and equipment. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A.Comply with requirements specified in other Sections. <br />1.For projects requiring compliance with sustainable design and construction practices and <br />procedures, use products for patching that comply with sustainable design requirements. <br />B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use <br />materials that visually match in-place adjacent surfaces to the fullest extent possible. <br />1.If identical materials are unavailable or cannot be used, use materials that, when installed, will <br />provide a match acceptable to Architect for the visual and functional performance of in-place <br />materials. Use materials that are not considered hazardous. <br />C.Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the <br />surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or <br />that might damage finished surfaces. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A.Existing Conditions: The existence and location of underground and other utilities and construction <br />indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence <br />and location of underground utilities, and other construction affecting the Work. <br />1.Before construction, verify the location and invert elevation at points of connection of sanitary <br />sewer, storm sewer, gas service piping, and water-service piping; underground electrical services; <br />and other utilities. <br />2.Furnish location data for work related to Project that must be performed by public utilities serving <br />Project site. <br />B.Examination and Acceptance of Conditions: Before proceeding with each component of the Work, <br />examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for <br />compliance with requirements for installation tolerances and other conditions affecting performance. <br />Record observations. <br />1.Examine roughing-in for mechanical and electrical systems to verify actual locations of <br />connections before equipment and fixture installation. <br />2.Examine walls, floors, and roofs for suitable conditions where products and systems are to be <br />installed. <br />3.Verify compatibility with and suitability of substrates, including compatibility with existing <br />finishes or primers. <br />C.Written Report: Where a written report listing conditions detrimental to performance of the Work is <br />required by other Sections, include the following: <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.