Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett PRODUCT REQUIREMENTS <br />2020046/2020047/2020048/2020049/2020055 01 60 00 - 2 <br />2. Data indicating compliance with the requirements specified in Part 2 "Comparable Products" <br />Article. <br />E. Substitution: Refer to Section 01 25 00 "Substitution Procedures" for definition and limitations on <br />substitutions. <br />1.3 SUBMITTALS <br />A. Product List: Submit a list, in tabular from, showing specified products. Include generic names of <br />products required. Include manufacturer's name and proprietary product names for each product. <br />1. Coordinate product list with Contractor's Construction Schedule and the Submittals Schedule. <br />2. Form: Tabulate information for each product under the following column headings: <br />a. Specification Section number and title. <br />b. Generic name used in the Contract Documents. <br />c. Proprietary name, model number, and similar designations. <br />d. Manufacturer's name and address. <br />e. Supplier's name and address. <br />f. Installer's name and address. <br />g. Projected delivery date or time span of delivery period. <br />h. Identification of items that require early submittal approval for scheduled delivery date. <br />B. Initial Submittal: Within 30 days after date of commencement of the Work, submit 3 copies of initial <br />product list. Include a written explanation for omissions of data and for variations from Contract <br />requirements. <br />1. At Contractor's option, initial submittal may be limited to product selections and designations that <br />must be established early in Contract period. <br />C. Completed List: Within 60 days after date of commencement of the Work, submit 3 copies of completed <br />product list. Include a written explanation for omissions of data and for variations from Contract <br />requirements. <br />D. Architect's Action: Architect will respond in writing to Contractor within 15 days of receipt of completed <br />product list. Architect's response will include a list of unacceptable product selections and a brief <br />explanation of reasons for this action. Architect's response, or lack of response, does not constitute a <br />waiver of requirement to comply with the Contract Documents. <br />1.4 QUALITY ASSURANCE <br />A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use <br />on Project, select product compatible with products previously selected, even if previously selected <br />products were also options. <br />1. Each contractor is responsible for providing products and construction methods compatible with <br />products and construction methods of other contractors. <br />2. If a dispute arises between contractors over concurrently selectable but incompatible products, <br />Architect will determine which products shall be used. <br />1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products, using means and methods that will prevent damage, deterioration, <br />and loss, including theft and vandalism. Comply with manufacturer's written instructions. <br />B. Delivery and Handling: <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.