Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br /> <br /> <br />Smith Sinnett TEMPORARY FACILITIES AND CONTROLS <br />2020046/2020047/2020048/2020049/2020055 01 50 00 - 5 <br />5. Do not install material that is wet. <br />6. Discard and replace stored or installed material that begins to grow mold. <br />7. Perform work in a sequence that allows wet materials adequate time to dry before enclosing the <br />material in gypsum board or other interior finishes. <br />D. Controlled Construction Period: After completing and sealing of the building enclosure but prior to the full <br />operation of permanent HVAC systems, maintain as follows: <br />1. Control moisture and humidity inside building by maintaining effective dry-in conditions. <br />2. Use temporary or permanent HVAC system to control humidity within ranges specified for installed <br />and stored materials. <br />3. Comply with manufacturer's written instructions for temperature, relative humidity, and exposure <br />to water limits. <br />3.7 OPERATION, TERMINATION, AND REMOVAL <br />A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit <br />availability of temporary facilities to essential and intended uses. <br />B. Maintenance: Maintain facilities in good operating condition until removal. <br />1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and <br />similar facilities on a 24-hour basis where required to achieve indicated results and to avoid <br />possibility of damage. <br />C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities <br />to permanent facilities until Substantial Completion. <br />D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it <br />has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. <br />Complete or, if necessary, restore permanent construction that may have been delayed because of <br />interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace <br />construction that cannot be satisfactorily repaired. <br />1. Materials and facilities that constitute temporary facilities are property of Contractor. Owner <br />reserves right to take possession of Project identification signs. <br />2. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction <br />period. Comply with final cleaning requirements specified in Section 01 7700 "Closeout <br />Procedures." <br />END OF SECTION <br /> <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392