Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett QUALITY REQUIREMENTS <br />2020046/2020047/2020048/2020049/2020055 01 40 00 - 7 <br />2. Incidental labor and facilities necessary to facilitate tests and inspections. <br />3. Adequate quantities of representative samples of materials that require testing and inspection. <br />Assist agency in obtaining samples. <br />4. Facilities for storage and field curing of test samples. <br />5. Preliminary design mix proposed for use for material mixes that require control by testing agency. <br />6. Security and protection for samples and for testing and inspection equipment at Project site. <br />H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality- <br />control services with a minimum of delay and to avoid necessity of removing and replacing construction <br />to accommodate testing and inspection. <br />1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br />1.10 SPECIAL TESTS AND INSPECTIONS <br />A. Special Tests and Inspections: Owner will engage a qualified special inspector to conduct special tests <br />and inspections required by authorities having jurisdiction as the responsibility of Owner, as indicated in <br />the Statement of Special Inspections attached to this Section, and as follows: <br />1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and <br />reviewing the completeness and adequacy of those procedures to perform the Work. <br />2. Notifying Architect and Contractor promptly of irregularities and deficiencies observed in the <br />Work during performance of its services. <br />3. Submitting a certified written report of each test, inspection, and similar quality-control service to <br />Architect with copy to Contractor and to authorities having jurisdiction. <br />4. Submitting a final report of special tests and inspections at Substantial Completion, which <br />includes a list of unresolved deficiencies. <br />5. Interpreting tests and inspections and stating in each report whether tested and inspected work <br />complies with or deviates from the Contract Documents. <br />6. Retesting and reinspecting corrected Work. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and <br />inspection log for Architect's and authorities' having jurisdiction reference during normal working hours. <br />1. Submit log at Project closeout as part of Project Record Documents. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392