Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett SUBMITTAL PROCEDURES <br />2020046/2020047/2020048/2020049/2020055 01 33 00 - 3 <br />1.6 SUBMITTAL REQUIREMENTS <br />A. Product Data: Collect information into a single submittal for each element of construction and type of <br />product or equipment. <br />1. If information must be specially prepared for submittal because standard published data are <br />unsuitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's catalog cuts. <br />b. Manufacturer's product specifications. <br />c. Standard color charts. <br />d. Statement of compliance with specified referenced standards. <br />e. Testing by recognized testing agency. <br />f. Application of testing agency labels and seals. <br />g. Notation of coordination requirements. <br />h. Availability and delivery time information. <br />4. For equipment, include the following in addition to the above, as applicable: <br />a. Wiring diagrams that show factory-installed wiring. <br />b. Printed performance curves. <br />c. Operational range diagrams. <br />d. Clearances required to other construction, if not indicated on accompanying Shop <br />Drawings. <br />5. Submit Product Data before Shop Drawings, and before or concurrent with Samples. <br />B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop <br />Drawings on reproductions of the Contract Documents or standard printed data. <br />1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following <br />information, as applicable: <br />a. Identification of products. <br />b. Schedules. <br />c. Compliance with specified standards. <br />d. Notation of coordination requirements. <br />e. Notation of dimensions established by field measurement. <br />f. Relationship and attachment to adjoining construction clearly indicated. <br />g. Seal and signature of professional engineer if specified. <br />C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these <br />characteristics with other materials. <br />1. Transmit Samples that contain multiple, related components such as accessories together in one <br />submittal package. <br />2. Identification: Permanently attach label on unexposed side of Samples that includes the following: <br />a. Project name and submittal number. <br />b. Generic description of Sample. <br />c. Product name and name of manufacturer. <br />d. Sample source. <br />e. Number and title of applicable Specification Section. <br />f. Specification paragraph number and generic name of each item. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.