Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett CONSTRUCTION PROGRESS DOCUMENTATION <br />2020046/2020047/2020048/2020049/2020055 01 32 00 - 4 <br />a. Subcontract awards. <br />b. Submittals. <br />c. Purchases. <br />d. Mockups. <br />e. Fabrication. <br />f. Sample testing. <br />g. Deliveries. <br />h. Installation. <br />i. Tests and inspections. <br />j. Adjusting. <br />k. Curing. <br />E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not <br />limited to, the Notice to Proceed, Substantial Completion, and Final Completion. <br />F. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual <br />costs. On the line, show dollar volume of the Work performed as of dates used for preparation of <br />payment requests. <br />1. Refer to Division 01 Section "Payment Procedures" for cost reporting and payment procedures. <br />2. Contractor shall assign cost to construction activities on the CPM schedule. Costs shall not be <br />assigned to submittal activities unless specified otherwise but may, with Architect's approval, be <br />assigned to fabrication and delivery activities. Costs shall be under required principal subcontracts <br />for testing and commissioning activities, operation and maintenance manuals, punch list activities, <br />Project Record Documents, and demonstration and training (if applicable), in the amount of 5 <br />percent of the Contract Sum. <br />3. Each activity cost shall reflect an accurate value subject to approval by Architect. <br />4. Total cost assigned to activities shall equal the total Contract Sum. <br />G. Contract Modifications: For each proposed contract modification and concurrent with its submission, <br />prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the <br />overall project schedule. <br />2.3 PRELIMINARY CONSTRUCTION SCHEDULE <br />A. Bar-Chart Schedule: Submit preliminary horizontal bar-chart-type construction schedule within seven <br />days of date established for the Notice of Award. <br />B. Preparation: Indicate each significant construction activity separately. Identify first workday of each <br />week with a continuous vertical line. Outline significant construction activities for first 60 days of <br />construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction <br />based on indicated activities. <br />2.4 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART) <br />A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type, <br />Contractor's Construction Schedule within [30] days of date established for the Notice to Proceed. Base <br />schedule on the Preliminary Construction Schedule and whatever updating, and feedback was received <br />since the start of Project. <br />B. Preparation: Indicate each significant construction activity separately. Identify first workday of each <br />week with a continuous vertical line. <br />1. For construction activities that require 3 months or longer to complete, indicate an estimated <br />completion percentage in 10 percent increments within time bar. <br />2.5 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE) <br />A. General: Prepare network diagrams using AON (activity-on-node) format. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.