Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett PAYMENT PROCEDURES <br />2020046/2020047/2020048/2020049/2020055 01 29 00 - 2 <br />3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of <br />Applications for Payment and progress reports. Coordinate with the Project Manual table of <br />contents. Provide several line items for principal subcontract amounts, where <br />appropriate. Include separate line items under required principal subcontracts for operation <br />and maintenance manuals, punch list activities, Project Record Documents, and <br />demonstration and training in the amount of 5 percent of the Contract Sum. <br />4. Round amounts to nearest whole dollar; total shall equal the Contract Sum. <br />5. Provide a separate line item in the Schedule of Values for each part of the Work where <br />Applications for Payment may include materials or equipment purchased or fabricated and stored, <br />but not yet installed. <br />a. Differentiate between items stored on-site and items stored off-site. DO NOT bill for off- <br />site stored materials. <br />6. Provide separate line items in the Schedule of Values for initial cost of materials, for each <br />subsequent stage of completion, and for total installed value of that part of the Work. <br />7. Allowances: Provide a separate line item in the Schedule of Values for each allowance. Show <br />line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured <br />quantity. Use information indicated in the Contract Documents to determine quantities. <br />8. Each item in the Schedule of Values and Applications for Payment shall be complete. Include <br />total cost and proportionate share of general overhead and profit for each item. <br />a. Temporary facilities and other major cost items that are not direct cost of actual work-in- <br />place may be shown either as separate line items in the Schedule of Values or distributed as <br />general overhead expense, at Contractor's option. <br />9. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for <br />Payment when Change Orders or Construction Change Directives result in a change in the <br />Contract Sum. <br />10. Shop Drawings and Mobilization- Applications for payment shall not include preparation of shop <br />drawings or mobilization. These items shall be included as part of work-in-place. <br />11. General Conditions: Applications for Payment for General Conditions shall be paid for in <br />proportion to the amount of work completed. <br />12. Bonds and Insurance: Applications for Bonds and Insurance shall be accompanied with invoices <br />from the Bond and Insurance provider. <br />1.4 APPLICATIONS FOR PAYMENT <br />A. Each Application for Payment shall be consistent with previous applications and payments as certified by <br />Architect and paid for by Owner. <br />1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and <br />final Application for Payment involve additional requirements. <br />B. Payment Application Times: The date for each progress payment is indicated in the Agreement between <br />Owner and Contractor. The period of construction Work covered by each Application for Payment is the <br />period indicated in the Agreement. <br />C. Payme nt Application Forms: Use AIA Document G702 and Contractor’s construction schedule <br />indicating Item No., % complete, amount earned, amount earned current pay period, and amount <br />remaining as form for Applications for Payment. <br />D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to <br />sign legal documents on behalf of Contractor. Architect will return incomplete applications without <br />action. <br />1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use <br />updated schedules if revisions were made. <br />2. Include amounts of Change Orders and Construction Change Directives issued before last day of <br />construction period covered by application. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392