Browse
Search
2021-289-AMS-CT Wilson construction-Orange County Renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-289-AMS-CT Wilson construction-Orange County Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 3:18:56 PM
Creation date
7/2/2021 3:06:31 PM
Metadata
Fields
Template:
Contract
Date
5/19/2021
Contract Starting Date
5/19/2021
Contract Ending Date
5/31/2021
Contract Document Type
Contract
Amount
$740,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett SUBSTITUTION PROCEDURES <br />2020046/2020047/2020048/2020049/2020055 01 25 00 - 3 <br />B. Substitutions for Convenience: Architect will consider requests for substitution if received within 60 days <br />after commencement of the Work. Requests received after that time may be considered or rejected at <br />discretion of Architect. <br />1. Conditions: Architect will consider Contractor's request for substitution when the following <br />conditions are satisfied. If the following conditions are not satisfied, Architect will return requests <br />without action, except to record noncompliance with these requirements: <br />a. Requested substitution offers Owner a substantial advantage in cost, time, energy <br />conservation, or other considerations, after deducting additional responsibilities Owner <br />must assume. Owner's additional responsibilities may include compensation to Architect <br />for redesign and evaluation services, increased cost of other construction by Owner, and <br />similar considerations. <br />b. Requested substitution does not require extensive revisions to the Contract Documents. <br />c. Requested substitution is consistent with the Contract Documents and will produce <br />indicated results. <br />d. Substitution request is fully documented and properly submitted. <br />e. Requested substitution will not adversely affect Contractor's construction schedule. <br />f. Requested substitution has received necessary approvals of authorities having jurisdiction. <br />g. Requested substitution is compatible with other portions of the Work. <br />h. Requested substitution has been coordinated with other portions of the Work. <br />i. Requested substitution provides specified warranty. <br />j. If requested substitution involves more than one contractor, requested substitution has been <br />coordinated with other portions of the Work, is uniform and consistent, is compatible with <br />other products, and is acceptable to all contractors involved. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392
The URL can be used to link to this page
Your browser does not support the video tag.