Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br />Smith Sinnett SUMMARY <br />2020046/2020047/2020048/2020049/2020055 01 10 00 - 1 <br />SECTION 01 10 00 - SUMMARY <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1. Project information. <br />2.Work covered by Contract Documents. <br />3.Contractor's use of site and premises. <br />4.Coordination with occupants. <br />5.Work restrictions. <br />6.Specification and Drawing conventions. <br />1.2 PROJECT INFORMATION <br />A.Project Identification: Orange County North Carolina – Facility Renovations <br />Justice Facility – First Floor <br />133 Mayo St. Hillsborough, NC 27278 <br />Criminal Justice Resources – Department Renovations <br />Ground Floor Court House <br />104 East Margaret Lane, Hillsborough, NC 27278 <br />Court Street Annex – Renovation <br />109 Court Street Hillsborough, NC 27278 <br />Orange County Health Department <br />Whitted Building <br />300 West Tryon Street, Hillsborough, NC 27278 <br />Orange County Health Department <br />Whitted Building – Window Replacement <br />300 West Tryon Street, Hillsborough, NC 27278 <br />B.Owner: Orange County, NC <br />1. Owner's Representative: Angel Barnes <br />C.Architect: Smith Sinnett Architecture. <br />1. Architect's Representative: Drew Wilgus. <br />D.Architect's Consultants: Architect has retained the following design professionals, who have prepared designated <br />portions of the Contract Documents: <br />1.Mechanical, Fire Sprinkle r, Electrical , and Plumbing Engineer: Progressive Design Collaborative, LTD <br />a.Representative: Steve Cam pbell, PE <br />1.3 WORK COVERED BY CONTRACT DOCUMENTS <br />A.The Work of Project is defined by the Contract Documents and consists of the following: <br />1. Project will include selective demolition to reconfigure rooms in several of the locations, Window <br />Replacement, refinishing of indicated interior finishes, installation of security protection between <br />staff and public , as indicated. The proposed work is as indicated in the Contract Documents. <br />1.4 CONTRACTOR'S USE OF SITE AND PREMISES <br />A.Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond <br />areas in which the Work is indicated. <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392