Orange County NC Website
Orange County Facility Renovations <br />Hillsborough, NC <br /> <br /> <br />Smith Sinnett SPECIAL CONDITIONS <br />2020046/2020047/2020048/2020049/2020055 00 90 10 - 1 <br />SECTION 00 90 10 - SPECIAL CONDITIONS <br /> <br />The following requirements are, in fact, Conditions of the Contract, and are in addition to the General Conditions, <br />Supplementary General Conditions and Special Conditions and are not intended to replace or otherwise conflict with <br />those Conditions. These Special Requirements are particular to the Work of this Project and are intended to inform <br />the Contractor of non-standard conditions affecting the Work of the Contract. <br /> <br />ARTICLE 1 - QUALIFICATION OF PROJECT SUPERINTENDENT <br /> <br />The Contractor shall be required to demonstrate his capability to provide a qualified project superintendent for <br />the project who is acceptable to the Owner and Architect. The project superintendent shall have at least five <br />years of successful experience on projects of similar size, scope and nature. Contractor shall be required to <br />substantiate these qualifications with a written submittal within seven calendar days after opening of the Bids. <br />The Contractor is charged with providing a qualified and experienced superintendent for this project to the <br />satisfaction of the Owner and Architect. The Owner reserves the right to disapprove a proposed superintendent <br />who does not appear to be fully qualified and experienced to accomplish the work of this project. <br /> <br />ARTICLE 2 - SINGLE PRIME AND SEPARATE PRIME CONTRACT BIDS <br /> <br />Bids will be received for Single Prime Contracts only. Opening of Bids, as it relates to the number of bids <br />required to allow opening, and award of Contracts, as it relates to low bid and the number of bids required to <br />allow award, shall be governed by the guidelines and procedures recommended by the State Department of <br />Construction of the N.C. Department of Administration for bid openings for single prime informal contract bids. <br /> <br />Those Bidders submitting Single Prime Contract bids shall be aware that all work of the project is included in <br />the Work of a Single Prime Contractor, regardless of the divisions of work indicated on the Drawings and in the <br />Project Manual. All references and indications in the Drawings and the Project Manual to Separate Prime <br />Contracts shall apply to the Single Prime Contract. <br /> <br />Single Prime Contract Bidders must include the names of their major subcontractors on the Proposal form as <br />indicated, to include Plumbing and Electrical. <br /> <br />Bid Alternates and Unit Prices identified shall be bid, as identified, by the Single Prime Contract Bidder, as <br />indicated on the Proposal form. <br /> <br />All Allowances identified shall all be included in the Single Prime Contract Bid. <br /> <br />ARTICLE 3 - COORDINATION AND COOPERATION WITH OTHER CONTRACTORS <br /> <br />Prime Contractor shall be aware that the Owner has or may engage other contractors to accomplish work <br />concurrently with the Work of this project, which will have a direct effect on the accomplishment of the Work <br />of this project. Contractors will be required to cooperate and coordinate with these other contractors during the <br />course of the project to avoid delays in the work of this project of that of the other contractors. <br /> <br />ARTICLE 4 – RESERVED <br /> <br />ARTICLE 5 - UNDERGROUND SERVICES <br /> <br />Prime Contractor and all subcontractors shall field locate all underground services whether shown on drawings <br />or not, including, but not limited to the following: utilities, underground wire, fiber optic lines, cable, conduit, <br />and pipe, prior to initiating any excavation on any area of the proposed site. Provide and pay for underground <br />utility locator service, metal detectors and hand digging as necessary to satisfy above requirements. Prime <br />Contractor (s) and their subcontractors shall be responsible for utility services damaged during construction and <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392