Orange County Facility Renovations Smith Sinnett 2020046/2020047/2020048/2020049/2020055 <br />Hillsborough, North Carolina Orange County <br /> <br />Addendum 2 ADD 2-2 <br />4. It is the intent that the five projects will be run simultaneously. At this time, priority is not set and will <br />depend on the most efficient execution. Again, the spaces will be operational and during <br />construction, and flexibility is anticipated and expected. <br />5. The Contractor’s Safety Record Information form 007220 and E-verify Addidavit 007230 need to be <br />completed and included with bid proposals. <br />6. As mentioned in the pre-bid conference, the Court Street Annex work area will require asbestos <br />abatement. This work is to be provided by the contractor. An Asbestos Design Report is attached. <br />7. All permit and review fees are the responsibility of the contractor. <br />Substitution Requests: <br />1. 12 59 00 System Furniture - National Office is to be considered an equal product manufacturer. <br />Specifications <br />1. Added Spec Section 024210_Asbestos Abatement and Lead Survey Report <br />2. Revision - Section 08 51 13 – Aluminum Windows <br />a. REVISE paragraph 2.2 A to read as follows: <br />“A. Basis of Design: TRACO TR-9100 or comparable product by one of the following:” <br />b. REVISE paragraph 2.2 C to read as follows: <br />“C. Insulating-Glass Units: ASTM E2190. Refer to Section 08 80 00 – Glazing – 1 inch <br />insulated unit with Between the Glass Muntins” <br />c. REVISE paragraph 2.3 a to read as follows: <br />“A. Head and Jamb Receptors (Subframes) with thermally broken subsills and end dams. <br />Include manufacturer extended aluminum sill covers to cap exterior brick” <br />3. Clarification - Division 12 - Refer to Whitted Window Replacement drawings for extent of the <br />blinds. All new windows are to receive louver blinds(12 21 13) in the base bid. All new windows will <br />receive roller shades (12 24 13) per Alternate E-1. Refer to 01 23 00. <br />4. Clarification – Section 00 72 00 – <br />a. 13.1.1 - The Contract time shall commence on a date to be specified in a written Notice to <br />Proceed from the Architect. Substantial Completion shall be 180 calendar days from <br />Notice to Proceed. Final Completion shall occur on or before Thirty (30) calendar days <br />from Substantial Completion. <br />b. 13.18.1 - The Contractor and the Contractor's surety’s shall be liable for and shall pay the <br />Owner the sum of Five Hundred Dollars ($500.00), herein stipulated as liquidated <br />damages, for each calendar day of delay until the Work is <br />substantially complete. <br /> <br />Drawings <br />1. Electrical Drawings – General Revision for all renovation sites - Scope of Data Work will now <br />include only junction boxes and conduit/bushing/pull string for receptacles in newly constructed <br />walls as described in the documents. Scope of Data Work will no longer include wiring, devices, <br />or cover plates. Demolition of existing data and surface-mounted data raceway shall be the <br />responsibility of the owner’s third party professional as well as new data devices, plates, surface- <br />mounted data raceway and cable. The General Contractor is responsible for coordinating schedule <br />with the owner’s data contractor. <br />2. Revised Justice Facility E0-01– Adjustment made to proposed Courtroom Lighting <br /> <br />End of Addendum 2 <br /> <br />DocuSign Envelope ID: 09980A3B-0691-41B4-854D-3865F2287392