Browse
Search
Agenda - 11-13-2001-7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 11-13-2001
>
Agenda - 11-13-2001-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:40:25 AM
Creation date
8/29/2008 10:35:24 AM
Metadata
Fields
Template:
BOCC
Date
11/13/2001
Document Type
Agenda
Agenda Item
7
Document Relationships
Minutes - 20011113
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 9 <br />BOCC Work Group on Chapel Hill Township Park and Educational <br />Campus <br />This group included Commissioners Broom and Gordon, County Mnnnger <br />John LiNc and ERC llirector David StancS. Land Conservation Ma~mger <br />Rich Shaw also attended one meetinR~ <br />This Work Gmup met oa July 20 end August 28 to discuss the site's natural <br />featums, site design mnsiderntions, and s pmresa for completing a rnncept <br />plan for [he park. <br />Products and discussion of the work group included <br />• Plan far meeting with Carrboxo xepresentativee (8/18/01) <br />• The potential for a Phece I of the park in the proposed bond <br />• Information on and possible realignment of the proposed mrmeotor mad <br />• I~'orma4on of the'1'owa of Carrboro'e approval process <br />• The parameters far forum master vte planing <br />• A map o[ natural features, and proposed inhsatructure <br />• A preliminary enncaptuel deeigu map (shared with BOCC oa August 21 by <br />mail and reviewed at October 22 workseaeionJ <br />• AstefRgenernted draft an Master Site Flaming Process, including <br />passible operating prmciplea Eor the park <br />The group has nut met since August 28, when the preliminary aonaeptual <br />plan was reviewed. The work to date of the group was presented at the <br />October 22 BOCC worksessian. <br />
The URL can be used to link to this page
Your browser does not support the video tag.