Browse
Search
2021-278-AMS-Bar Roofing and Maintenance-Construction Contract Allowance Reconcilation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-278-AMS-Bar Roofing and Maintenance-Construction Contract Allowance Reconcilation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 2:46:30 PM
Creation date
7/2/2021 2:46:10 PM
Metadata
Fields
Template:
Contract
Date
5/10/2021
Contract Starting Date
5/10/2021
Contract Ending Date
5/17/2021
Contract Document Type
Contract
Amount
-$17,863.25
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BAR Roofing & Maintenance / 1313 S. Park Dr., Kernersville, NC 27284 / P: 336.391.1670 <br /> <br /> <br />CHANGE ORDER PROPOSAL <br /> <br />PROJECT NAME: ORANGE COUNTY SPORTSPLEX <br />PROJECT ADDRESS: 101 MEADOWLANDS DR, HILLSBOROUGH, NC 27278 <br />CHANGE ORDER #: 2 <br />RE: DELETION OF ½” HD ISO OVER CRICKETS <br />TO: ATLAS ENGINEERING ATTN: ROB TATUM <br /> <br />This Deductive Change Order Proposal is to reflect the change in cost, associated with the labor, <br />material, equipment, etc. no longer needed to complete the scope below. <br /> <br />DETAILED SCOPE ADJUSTMENT: <br /> <br /> Although it was purchased and delivered to the sight, the installation of the ½” HD ISO <br />over the crickets/saddles, was not completed in the field. This deductive change order <br />includes approx. 885 sqft of materials and labor not used to install the HD ISO. <br /> <br /> <br />CHANGE ORDER COST BREAKDOWN: <br /> <br />½” HD ISO……………………………………………………………………………… - $ 354.00 <br /> <br />Polyset Board-Max…………...…………………………………………………………. - $ 177.00 <br /> <br />Labor…………………….................................................................................................. - $ 104.00 <br /> <br />5% OH/P………………………………………………………………………………… - $ 31.75 <br /> <br />CHANGE ORDER TOTAL…………………………………. - $ 666.75 <br /> <br /> <br /> <br /> <br />Signature of Acceptance: <br />DocuSign Envelope ID: 0EF7DD70-27CA-4E40-8E88-1E6140CEC524
The URL can be used to link to this page
Your browser does not support the video tag.