Browse
Search
2021-278-AMS-Bar Roofing and Maintenance-Construction Contract Allowance Reconcilation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-278-AMS-Bar Roofing and Maintenance-Construction Contract Allowance Reconcilation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 2:46:30 PM
Creation date
7/2/2021 2:46:10 PM
Metadata
Fields
Template:
Contract
Date
5/10/2021
Contract Starting Date
5/10/2021
Contract Ending Date
5/17/2021
Contract Document Type
Contract
Amount
-$17,863.25
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BAR Roofing & Maintenance / 1313 S. Park Dr., Kernersville, NC 27284 / P: 336.391.1670 <br /> <br /> <br />CHANGE ORDER PROPOSAL <br /> <br />PROJECT NAME: ORANGE COUNTY SPORTSPLEX <br />PROJECT ADDRESS: 101 MEADOWLANDS DR, HILLSBOROUGH, NC 27278 <br />CHANGE ORDER #: 6 <br />RE: BASE BID UNUSED ALLOWANCES DEDUCT <br />TO: ATLAS ENGINEERING ATTN: ROB TATUM <br /> <br />This Change Order Proposal is to reflect the change in cost, associated with unused portions of the <br />Base Bid Allowances. This proposal includes the costs of COR’s #3 & 5, effectively withdrawing <br />them as stand alone COR’s. COR #4 is also withdrawn as the damaged skates will be billed <br />directly to BAR Roofing. <br /> <br />BASE BID ALLOWANCES: <br /> <br />1. Metal Deck Restoration - 1,000 sqft @ $3.50……………….………….…..$3,500.00 <br />2. Metal Deck Replacement - 50 sqft @ $6.25……………….……….…….…..$ 312.50 <br />3. Metal Deck Repair - 100 sqft @ $6.00…..…………………………….$ 600.00 <br />4. Wood Blocking Replacement - 200 bdft @ $3.75………………………….……..$ 750.00 <br />5. Plywood Replacement - 600 sqft @ $4.75…………………………………$2,850.00 <br />6. 5/8” Gypsum Replacement - 1,000 sqft @ $1.50……………………………….$1,500.00 <br />7. Additional Walk Tread - 500 lft @ $8.00……………………………...…...$4,000.00 <br />8. Rubber Paver - 100 ea @ $33.00……………………………….…$3,300.00 <br />9. Tapered Insulation - 3,000 sqft @ $1.30…………………………….…$3,900.00 <br />TOTAL BASE BID ALLOWANCES……………………………………………… $20,712.50 <br /> <br /> <br />BASE BID ALLOWANCES MINUS USED QUANTITIES <br /> <br />Metal Deck Restoration ……………………………………………………………….…$1,487.50 <br />Metal Deck Replacement ……….………………………………………………………..$ 312.50 <br />5/8” Gypsum Replacement …………………………………………………….…………$ 990.00 <br />Rubber Pavers……………………………………………………………………….……..$ 66.00 <br /> <br />TOTAL ALLOWANCES USED…………………………………………………..…....$2,856.00 <br /> <br />TOTAL UNUSED ALLOWANCES………………...….... - $17,856.50 <br /> <br /> <br /> <br />Signature of Acceptance: <br />DocuSign Envelope ID: 0EF7DD70-27CA-4E40-8E88-1E6140CEC524
The URL can be used to link to this page
Your browser does not support the video tag.