Browse
Search
2021-244-E-AMS-Intellicom, Inc Northern Campus Detention Center AV install
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-244-E-AMS-Intellicom, Inc Northern Campus Detention Center AV install
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:08 AM
Creation date
6/15/2021 10:31:27 AM
Metadata
Fields
Template:
Contract
Date
5/5/2021
Contract Starting Date
5/5/2021
Contract Ending Date
8/5/2021
Contract Document Type
Agreement - Services
Amount
$43,123.93
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:52A89AAF-4F9B-4171-A9AB-856EB935BF90 <br /> E1[' 2902 S. Miami Blvd Suite C <br /> icom ,In Inc. Durham, NC 27703 <br /> Office: 919.957.1949 <br /> communication specialists Fax: 919.957.8737 <br /> May 5, 2021 <br /> TO: Orange County <br /> Alan Dorman <br /> RE: North Campus Detention Center AV <br /> Intellicom Inc. appreciates the opportunity to submit this Proposal for integrated AV equipment in the spaces <br /> inside the new North Campus county Detention Center as follows. <br /> Lobby <br /> • Install 1 55"display for signage content provided by user <br /> • Provide content integration of BAS information as provided by client <br /> Workroom/Conference AA08 <br /> • Install up to (1) 65" display with wall controller in user-specified location for content presentation. <br /> • Install 1 HDMI extension for laptop connections (via existing floor boxes) <br /> • Install up to (2) overhead speakers for presentation audio <br /> Secure Area— Large Training Room AA86 <br /> • Install (2) 75"flat panel displays (client-specified grade) mounted on front wall <br /> 0 Displays will use surface mount cabling to display identical content image <br /> • Install HDMI single gang wall extender wall box for laptop connections <br /> o CATx cable extension connections via Data room AA80 <br /> • Install (2)surface mounted vandal-resistant speakers on front wall <br /> • Install single-gang controller on front wall (final location TBD)for system on/off <br /> • Connect all speakers, HDMI extenders, and network connections via Data AA80 <br /> 0 1 RU of equipment to be installed in AA80 racks <br /> Secure Area—Large Training room AA85 <br /> • Install (1)celling mounted 4000 lumen laser projector system in center of room for content <br /> presentation <br /> o Install (1)wall mounted manual projection screen measuring 137" diagonally <br /> o Install (1)single gang HDMI extension in front wall for laptop connections <br /> o Install (1)single gang wall controller for system on/off on front wall (surface mounted) <br /> • Install (4)vandal-resistant, surface mounted speakers on room ceiling in GC-installed enclosures <br /> • Connect all speakers, HDMI extenders, and network connections via Data AA80 <br /> 0 1 RU of equipment to be installed in AA80 racks <br /> Secure Area—Day Room Displays <br /> • Install (15)wall-mounted 55" displays in locations specified by client on 2nd floor of facility <br /> Providing all your communication needs including:VOICE*DATA*FIBER OPTICS*PUBLIC ADDRESS*SECURITY*AUDIO VISUAL <br /> Visit us on the Web @ www.intellicomrtp.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.