Browse
Search
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:54 AM
Creation date
6/15/2021 10:30:57 AM
Metadata
Fields
Template:
Contract
Date
5/17/2021
Contract Starting Date
5/3/2021
Contract Ending Date
4/30/2022
Contract Document Type
Agreement - Services
Amount
$15,270.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:35DE8770-E58E 4C2C-927C 2DA561B203BF <br /> Ww <br /> ASSUMPTIONS & EXCLUSIONS <br /> 1. No bidding assistance is provided. <br /> 2. No liability is assumed for the accuracy of other consultant's work or information <br /> provided by the Owner used in the production of our documents. <br /> 3. The Owner will pay all regulatory application/permitting/filing/recording fees, either <br /> directly or as reimbursable expense. These fees are not included in this proposal. <br /> 4. All utility design other than domestic water, sanitary sewer and stormwater shall be <br /> designed by others. <br /> ADDITIONAL SERVICES <br /> Any item not contained in the scope of services or items as exclusions will be deemed as <br /> Additional Services. Additional Services will be provided if requested by the Client for a <br /> negotiated lump sum fee or at our Standard Hourly Billing Rates. <br /> CLIENT RESPONSIBILITIES <br /> It shall be the responsibility of the Client to provide the following items: <br /> 1. Access to the site. <br /> 2. Any other electronic information that has been obtained or developed for the site, <br /> including all survey and environmental information PDF and AutoCAD versions as <br /> applicable. <br /> 3. Payment of all required permit and review fees <br /> 4. Decisions on critical design issues as necessary in a timely manner. <br /> 5. Payment of all invoices per Conditions of the Agreement. <br /> Note: <br /> Please see attached separate documentation from Power Solutions for the Generator and <br /> Automatic Power Switch specifications and fee proposal for the installation of the unit. <br /> (Fee quote of$294,782.60) <br />
The URL can be used to link to this page
Your browser does not support the video tag.