Browse
Search
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:54 AM
Creation date
6/15/2021 10:30:57 AM
Metadata
Fields
Template:
Contract
Date
5/17/2021
Contract Starting Date
5/3/2021
Contract Ending Date
4/30/2022
Contract Document Type
Agreement - Services
Amount
$15,270.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:35DE8770-E58E 4C2C-927C 2DA561B203BF <br /> Task 2—Zoning Permit Review Process: <br /> SUMMIT will follow up with the Town of Hillsborough planning staff to obtain receipt of <br /> comments from the various Town departments. Upon receipt of the review letter/comments, <br /> SUMMIT will prepare revised plans and comment responses and submit back to the Town of <br /> Hillsborough for action/approval. For this TASK, SUMMIT will respond to two (2) review cycles. <br /> Any additional meetings or revisions required for subsequent review cycles will be done on a time- <br /> and-material basis according to the attached Schedule of Standard Rates. <br /> Task 3—Permitting: <br /> We anticipate that the following permits will be required as part of the Site Plan and Construction <br /> Drawings approval process and will be needed for construction of the project. SUMMIT will <br /> prepare and submit the applications to be reviewed by each authority.The scope of work for this <br /> task also includes plan/application revisions as may be requested from each authority for minor <br /> changes to the plans and documents. Any major changes or requests will be done on a time-and- <br /> material basis according to the attached Schedule of Standard Rates. <br /> • Town of Hillsborough Site Plan & Zoning Permits <br /> o SUMMIT will provide the required information for the Site/Zoning Permit <br /> application as required by the Town of Hillsborough. <br /> These are the only Site Design permits anticipated at this time. If during the review process it is <br /> determined that other permits will be required, we will provide those services according to our <br /> Schedule of Standard Rates or per an approved Change Order. <br /> Task 4—Construction Administration: <br /> Construction Administration services during the construction phase of the project including <br /> intermittent site inspections (up to 4 inspections total), answer miscellaneous questions from the <br /> contractor, review materials submittals from the contractor, coordinate as needed with the Town <br /> of Hillsborough and answer questions from the owner/client. This task will be done on a time- <br /> and-material, not to exceed, basis according to the attached Schedule of Standard Rates. Any <br /> additional work will be approved via Change Order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.