Browse
Search
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-242-E-AMS-Summit Design and Engineering Services- PFAP generator design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:54 AM
Creation date
6/15/2021 10:30:57 AM
Metadata
Fields
Template:
Contract
Date
5/17/2021
Contract Starting Date
5/3/2021
Contract Ending Date
4/30/2022
Contract Document Type
Agreement - Services
Amount
$15,270.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:35DE8770-E58E 4C2C-927C 2DA561B203BF <br /> Vw <br /> SCOPE OF WORK <br /> Task 1 —Design Development/Site Plans: <br /> SUMMIT will prepare a Site/Utility Plan drawing specifically for the installation of a new <br /> backup generator to serve the building. Following a site inspection and meeting with Gerald <br /> Cates from Power Solutions and Eric Hallman,the Executive Director of the PFAP facility, the <br /> proposed design location for the generator is near the southwest corner at the rear of the <br /> building.This location is adjacent to a rear door and hallway that contains the existing service <br /> panel breaker boxes for the building. This proposed location will require the removal of 2 <br /> trees near the property line as well as temporarily removing and replacing an existing Duke <br /> Energy power line. The Site/Utility Plan will include the plan information needed for the <br /> installation of the generator, including any required demolition or temporary removal and <br /> replacement of other site features. Following preparation of the design drawings, we will <br /> submit to the Town of Hillsborough for review and approval of a Zoning Compliance Permit. <br /> For the Site/Utility Plan Design the following deliverables are included with this scope: <br /> Deliverables: <br /> 1. Detailed Cover Sheet <br /> a. Required notes and calculations per the Town of Hillsborough <br /> b. Site Data Tables <br /> c. Committed elements per the Development Plan <br /> 2. Existing Conditions and Demolition Plan Sheet <br /> a. Existing site data table <br /> b. Required notes, calculations and labels per the Review Checklist <br /> c. Existing site conditions/items to be demolished. <br /> 3. Site/Utility Plan <br /> a. Required notes and labels per the Review Checklist <br /> b. Utility information specifically related to the design and <br /> installation/replacement of the new grease interceptors. <br /> 4. Site/Utility Details <br /> a. Site and utility details as related specifically to the proposed work for the <br /> project. <br /> All drawings will be provided in AutoCAD format. SUMMIT will coordinate with the Town of <br /> Hillsborough Planning and the Town of Hillsborough Utilities Division as needed for plan <br /> reviews. <br /> Meetings and Coordination - On-going meetings and coordination with the Client, project <br /> team and reviewing agencies will be required throughout this phase. A total of two meetings <br /> for two staff members have been included for this phase of work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.