Orange County NC Website
            <br />  <br />2 <br />WRITTEN CONTRACTOR QUESTIONS <br /> <br />1. What is the pipe size and type (PVC or DIP) where we are connecting near the existing <br />cleanout? RESPONSE: 4” PVC. <br /> <br />2. The plans stated 4" PVC and SDR 35 PVC. Are we allowed to use either Sche 40 PVC or SDR <br />35 PVC? RESPONSE: correct, either will be acceptable. <br /> <br />3. Can all the cleanouts be PVC? RESPONSE: yes <br /> <br />4. Can all the 4" Combination WYE be PVC? RESPONSE. yes <br /> <br />5. The abandoning existing Pump Station includes termination of the electric at the <br />existing electric box that supplies the pump station? RESPONSE: include the termination of the <br />electric. <br /> <br />6. Can work be performed on the Weekends? RESPONSE: correct, coordinate the schedule with <br />Orange County. <br /> <br />7. Can we trim limbs to have ariel clearance for equipment? RESPONSE: yes. <br /> <br />End of Addendum #1 <br /> <br />  <br />DocuSign Envelope ID: 75A81F4F-8510-4BAA-A8B6-453D37D0360C