Browse
Search
2020-761-E-AMS-BBUDC Inc.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-761-E-AMS-BBUDC Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 12:18:52 PM
Creation date
6/14/2021 12:18:23 PM
Metadata
Fields
Template:
Contract
Date
10/19/2020
Contract Starting Date
10/19/2020
Contract Ending Date
10/22/2020
Contract Document Type
Contract
Amount
$4,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />September 28, 2020 <br /> <br />Angel Barnes <br />Orange County Asset Management Services <br />abarnes@orangecountync.gov <br /> <br /> <br />Re: Orange County Stormwater Services <br /> Transportation Administration Building <br /> <br />Addendum #1 <br /> <br />This Addendum, applicable to work designated herein, shall be understood to be and is an <br />Addendum. As such, it shall be part of, and include in, the contract, and modifies the original <br />bidding documents. The following questions were asked at the pre-bid meeting. A list of attendees <br />for the meeting is attached. <br /> <br /> <br />Item #1 – Lateral layout changes <br /> <br />As discussed in the field, there was a light pole at the end of the parking lot. The C-1 drawing has <br />been revised as per the attached. Note, there are two trees that will need to be removed for the <br />construction of the lateral. Minor limbing of existing trees to a height of 14’ will be allowed to <br />facilitate equipment from impacting tree limbs. <br /> <br />Item #2 – Hours of work <br /> <br />The busses that operate at the facility end at 5 pm. When cutting across the pavement at the main <br />driveway, one way traffic will be required to be maintained at all times. It will be up to the <br />contractor to coordinate with the County as to schedule the crossing. <br /> <br />Item #3 – Lay down area <br /> <br />A lay down area will be provided on site, coordination with the County will be required to <br />determine the exact location. <br /> <br />Item #4 – Budget Number <br /> <br />The estimated cost for this project is $35,000. <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 75A81F4F-8510-4BAA-A8B6-453D37D0360C
The URL can be used to link to this page
Your browser does not support the video tag.