Browse
Search
2020-761-E-AMS-BBUDC Inc.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-761-E-AMS-BBUDC Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 12:18:52 PM
Creation date
6/14/2021 12:18:23 PM
Metadata
Fields
Template:
Contract
Date
10/19/2020
Contract Starting Date
10/19/2020
Contract Ending Date
10/22/2020
Contract Document Type
Contract
Amount
$4,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Know what's below. <br />before you dig.Call <br />R 08-31-2020BYDATEREVISIONS132456PROJECT NO. <br />SHEET NO.PROJECT ENGINEER/ARCHITECTPROJECT MANAGERDRAWN BY7DRAWING NAME:DS (DON.SEVER@SUMMITDE.NET)20-0014ORANGE CO. HILLSBOROUGH, NC, 27278135 E MARGARET LANESITE PLANCreatively Inspired - Technically ExecutedLicense #: P-0339320 Executive Ct.Hillsborough, NC 27278-8551Voice: (919) 732-3883 Fax: (919) 732-6676www.summitde.netFIRST ISSUE DATETRANSPORTATION BLDG20-0014_S <br />C-2 NOTES AND DETAILSSewer Service Lateral Connection: <br />1. Apply for and secure all applicable plumbing and/or code specific permits from Orange County Inspections Division prior to starting work. <br />2.Provider shall provide any traffic control or other safety measures according to the most current NCDOT, OSHA or other safety requirements related to <br />the work being performed. <br />3.Excavate to existing PVC line at the location shown. <br />4.Install 4-inch sewer service lateral with all fittings and appurtenances (Schedule 40 PVC pipe or ductile iron pipe, depending on site conditions) to connect <br />existing wastewater discharge system to existing sewer service stub-out. Note for the roadway crossings, coordinate with the County to determine when <br />the open cuts can be made with minimal disruption to the facility. Provide metal plate until trench can be properly restored with asphalt. <br />5.Cap existing wastewater line to septic tank. <br />6. Coordinate final inspections and secure final certifications from Orange County Inspection Division. <br />7.Restore site to pre-construction conditions, seed and straw all disturbed areas when done. <br /> Septic Tank Abandonment: <br />1.Secure an Existing System Authorization from Orange County Environmental Health to abandon the existing septic tank, prior to starting work. <br />2.Contractor shall provide any traffic control or other safety measures according to the most current NCDOT, OSHA or other safety requirements related to <br />the work being performed. <br />3. The existing septic tank will need to be pumped by a North Carolina registered septage hauler and then properly abandoned. <br />4.An Orange County Environmental Health Inspector must be present when the septic tank is collapsed. <br />5. Restore site to pre-construction conditions, seed and straw all disturbed areas when done. <br />NOTES: <br />DocuSign Envelope ID: 75A81F4F-8510-4BAA-A8B6-453D37D0360C
The URL can be used to link to this page
Your browser does not support the video tag.