Browse
Search
2020-760-E-AMS-Custom Stone NC Inc
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-760-E-AMS-Custom Stone NC Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 12:16:48 PM
Creation date
6/14/2021 12:16:32 PM
Metadata
Fields
Template:
Contract
Date
10/7/2020
Contract Starting Date
10/7/2020
Contract Ending Date
10/21/2020
Contract Document Type
Contract
Amount
$98,338.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 07/20 <br /> 1 <br /> [Departmental Use Only] <br /> TITLE VETERANS MEMORIAL <br /> FY 2020/2021 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 6th day <br />of October, 2020, by and between Custom Stone NC, Inc, (hereinafter called the “Contractor”), and <br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by NA (Sheet dated ) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. Custom Stone NC Inc.will construct a Veterans Memorial Plaza composed of a <br />concrete,stone and paver plaza with a flagpole located in the center of the plaza. See <br />attached Estimate #8370. proposal dated April 30th, 2020 which fully describes the work <br />to be performed. Such work will hereafter be called the “Work”. <br /> <br />d. Related documents listed under Section 1 above. <br /> <br />DocuSign Envelope ID: 4C2AA149-C4BF-4E4C-8DDD-59575EAB67F2
The URL can be used to link to this page
Your browser does not support the video tag.