Browse
Search
Agenda - 11-05-2003-8f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-05-2003
>
Agenda - 11-05-2003-8f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:16:40 AM
Creation date
8/29/2008 10:35:18 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2003
Document Type
Agenda
Agenda Item
8f
Document Relationships
2003 NS Housing - Nannie McAdams Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031105
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Na~nnie McAdams <br />160 Torain St. <br />Hillsborough <br />732-7429 <br />Kitchen: <br />1. Install a six panel, metal insulated door unit with weather-stripping, <br />aluminum threshold, lockset and deadbolt to be keyed the same as the <br />front locksets and a wide view peephole and matching interior trim. <br />2. Install a vinyl over wood storm door with pneumatic closure and vinyl <br />sweep. Door to have a lifetime warranty. <br />3. Install one vinyl replacement window and trim. Window to have one <br />openable sash, locks and screen. <br />4. Paint the ceiling with ceiling white latex paint. Paint the trim and door with <br />semigloss, latex paint. Paint to cover completely. <br />5. Remove the baseboard. Install'/4 inch, wood paneling and trim. Install 1x6 <br />baseboard. <br />6. Install '/ inch lauan plywood on the floor. Prepare the plywood for vinyl. <br />7. Install vinyl floor covering, metal trim and shoe mold. 'Vinyl to cost not less <br />than $14/yd. <br />8. Install custom-made sink base to match the existing cabinets. <br />9. Install a rolled back, formica top. <br />Bath: <br />1. Remove the wall covering tub, vanity and commode. <br />2. Insulate the exterior wall to R-15. <br />3. Repair the floor and sub floor with like-size material. <br />6 <br />4. Replace four deteriorated studs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.