Browse
Search
2020-735-E-AMS-Warren Hay Mechanical Contractors Inc.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-735-E-AMS-Warren Hay Mechanical Contractors Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 11:56:01 AM
Creation date
6/14/2021 11:54:39 AM
Metadata
Fields
Template:
Contract
Date
10/15/2020
Contract Starting Date
10/15/2020
Contract Ending Date
10/20/2020
Contract Document Type
Contract
Amount
$70,237.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Coordination and Approval <br />7.6 Any requested changes to this policy will be coordinated with Asset Management, Risk <br />Management and the Orange County Fire Marshal prior to the change being <br />implemented <br />7.7 All departments annotated below have coordinated and given their approval via <br />signature to this Hot Work Program Operating Instruction <br />7.8 Asset Management Project Managers or are to sign with their approval, the Hot Work <br />Permit, indicating that the site has been inspected for safety prior t o work, as instructed <br />on the Hot Work Form, and that a Fire Watch will be maintained by trained personnel or <br />approved methods (i.e. detection systems in working order). The signee assumes <br />responsibility for the work site and workers. <br /> <br />DocuSign Envelope ID: 83115E6C-E328-4C43-8E3A-42C2A7503DB8
The URL can be used to link to this page
Your browser does not support the video tag.